S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
34. A licence holder must notify the Minister at least 15 days before the calibration of a meter prover or a master meter.
A copy of the calibration certificate is sent to the Minister within 30 days following the calibration.
O.C. 1251-2018, s. 34.
In force: 2018-09-20
34. A licence holder must notify the Minister at least 15 days before the calibration of a meter prover or a master meter.
A copy of the calibration certificate is sent to the Minister within 30 days following the calibration.
O.C. 1251-2018, s. 34.